  solar

NT Pro Test Loop Project Solar Collector(Project Contact:  Solar Millenium)

This project was a solar thermal electric generating facility located in the Mojave Desert near Kramer Junction, in San Bernardino County California. Our project scope included geotechnical services and land surveying services during or just prior to construction.  Our land surveying was performed to assure quality control of Solar Tower footings & bolt placements.  The footings required high orders of accuracy on 2 rows of bolts within 42 footings.Our geotechnical services included a field investigation, laboratory testing, foundation design and recommendations for site improvements. We also provided compaction testing and inspection during grading operation, concrete mix design review and approval, ICC inspection during placement of rebar and concrete foundations.
solar

Tumbleweed Sun Tower - (Project Contact:    Solar Millenium)


A 160 acre project located between Avenue B & 110th St West in Los Angeles County California
Boundary surveying, contour mapping, and hydrology study

Solar Voltaic Sites - 29 Palms ( Project Contact: Solar Electric Solutions, LLC )

SEPV-2  - 20 Acres – 2 Megawatt - Our services included boundary surveying, aerial photography, Hydrology Study, Site Plan, Grading Plan, and Water Quality. Management Plan (WQMP) pier sinking observation and compaction testing for the solar power plant.

solar

Solar Voltaic Sites - 29 Palms ( Project Contact: Solar Electric Solutions, LLC )

SEPV-8  - 100 Acres – 12 Megawatt - Our services included boundary surveying, aerial photo, Hydrology Study, Site Plan, Grading Plan, and Water Quality. Management (WQMP) for the CUP application for the solar power plant.

SEPV-9  - 80 Acres – 2 Megawatt - Our services included boundary surveying, aerial photo, Hydrology Study, Site Plan, Grading Plan, and Water Quality. Management (WQMP) for the CUP application for the solar power plant.

Solar Voltaic Sites – Lancaster

25 total acres in two locations. One site is a 4.6MW facility located on 16 acres and the other site is a 3.2MW located on 5 acres, both located within 2 infill areas on the east side of the City of Lancaster, CA. Our project scope included services to assist in the submittal of a Conditional Use Permit (CUP) for the project. Future services include construction plans, surveying, and compaction and special inspection for facility. Our services included CUP application assistance, Site Plan, and
Phase I Environmental Assessment (ESA) for the proposed solar
power plants.

Solar Voltaic Sites – Hesperia

20 acre 2MW facility located south of Hesperia, CA. Our project scope included services to assist in the submittal of a
Conditional Use Permit (CUP) for the project. Future services include construction plans, surveying, and geotechnical services. Our services included CUP application assistance, a boundary survey, aerial photography and topographic mapping, Hydrology Study, Site
Plan, and Water Quality Management Plan (WQMP) for the solar power plant.

solar

Palmdale Solar Voltaic Site - (Project Contact:Solar Electric Solutions, LLC )

SEPV-1  -17 Acres - 2 Megawatt solar voltaic facility located on the east side of the City of Palmdale in Los Angeles County, California. We assisted in the submittal of a Conditional Use Permit for the project. Boundary surveying, aerial photography, hydrology study, site plan, grading plan, and water quality management plan for the solar power plant. During construction we provided material testing and continuous inspection for compactuin and driven piles.

 